UFGS 02 66 10 Test Fill

2.6 GEOTEXTILEThe geotextile layer shall be as specified in Section 31 05 19 GEOTEXTILE and as shown on the drawings.

2.7 GRANULAR DRAINAGE LAYERThe granular drainage layer shall consist of a [300] [_____] mm [12]

[_____] inch layer as specified in Section [32 11 30 DRAINAGE LAYER]

[_____] and as shown on the drawings.

2.8 SELECT FILL

**************************************************************************

NOTE: Top soil is usually not placed on the test

fill. However, the weight of the top soil may be

simulated by the placement of additional select fill.

**************************************************************************The select fill shall consist of a [600] [_____] mm [24] [_____] inch layer of select fill material as specified in Section 02 66 00 SELECT FILL AND TOPSOIL FOR LANDFILL COVER and as shown on the drawings.2.9 EQUIPMENTThe test fill shall be constructed to demonstrate that the proposed

equipment and procedures are acceptable for construction of the full scale landfill [liner] [cover]. Equipment used shall be as specified in the sections referenced. Contact the geosynthetics manufacturers for recommendations on geosynthetics and soil placement equipment.

PART 3 EXECUTION

3.1 GENERAL3.1.1 Location**************************************************************************

NOTE: The location of the test fill along with plan

and section views should be included on the drawings.

**************************************************************************Construct the test fill at the location shown on the drawings.

[Photographs] [and] [videotape] shall be made during construction of each layer of the test fill to document construction techniques.

3.1.2 Size**************************************************************************

NOTE: The test fill should be a minimum of 3 to 4

times wider than the compaction equipment proposed.

The demonstration area should be long enough to

allow construction equipment to achieve normal

operating speed for a distance of 7.6 meters (25

feet).

**************************************************************************The top surface of the test fill shall be a minimum of [30] [_____] meters

[100] [_____] feet long and [22] [_____] meters [70] [_____] feet wide.

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说教育文库UFGS 02 66 10 Test Fill(7)在线全文阅读。

UFGS 02 66 10 Test Fill(7).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/jiaoyu/1164464.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: