sets:
zone/A,B,C/; !A,B,C三个地区;
number/1..4/; !各地区可选择新建的销售点数目,可选1~4中的一个数,通过links把zone和number联系起来;
links(zone,number):c,profit; !若在i地区新建j个销售点,则c(i,j)=1,否则c(i,j)=0.profit(i,j)表示在i地区新建j个销售点的利润; endsets data:
profit=200 280 330 340 210 220 225 230 160 170 180 200; enddata
max=@sum(links:c*profit); @for(zone(I):
@sum(number(J):c(I,J))=1); !对于每一个地区,新建销售点的数目是一定的,c的和为1;
@sum(zone(I):@sum(number(J):c(I,J)*J))=6; !三个地区新建的销售点总数为6; @for(links(i,j):@bin(c(i,j))); !每一个c(i,j)只能取0或1; end
用Lingo求解,结果如下: Global optimal solution found.
Objective value: 710.0000 Extended solver steps: 0 Total solver iterations: 0
Variable Value Reduced Cost C( A, 1) 0.000000 -200.0000 C( A, 2) 0.000000 -280.0000 C( A, 3) 1.000000 -330.0000 C( A, 4) 0.000000 -340.0000 C( B, 1) 1.000000 -210.0000 C( B, 2) 0.000000 -220.0000 C( B, 3) 0.000000 -225.0000 C( B, 4) 0.000000 -230.0000 C( C, 1) 0.000000 -160.0000 C( C, 2) 1.000000 -170.0000 C( C, 3) 0.000000 -180.0000 C( C, 4) 0.000000 -200.0000
则在A,B,C区域应分别新增3,1,2个销售点,可获得的最大利润为710万元。
四、目标规划
有11件任务(A—K)分配到4个工作站(1—4),任务的优先次序如下图。每件任务所花费的时间如下表。
百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说综合文库运筹学实例分析及lingo求解(9)在线全文阅读。
相关推荐: