Various stages of the project cost control

Chung-Ho Chen

Abstract:Project Cost Management is the basic content of determining reasonable and effective control of the project cost. There are two projects cost implications, the corresponding project cost management has two, one for the management of project investment, a price for the project management. Works against investment management, the so-called project cost effective control is to optimize the building programme, designed on the basis of the programme, in the various stages of construction procedures, using certain methods and measures the cost of the project have control at a reasonable scope and approved Within the limits of the cost.

KEY WORDS:Engineering project cost cost management cost control cost limit 1. Project cost management problems that exist in

China's current stage of the project cost for project management to settle at for the purpose, focus only on the construction process of cost control, neglect of pre-construction project investment decision-making stage of cost control. Investment decision-making phase of the construction project investment estimate is an important basis for decision-making, it has a direct impact on national economic and financial analysis of the results of the reliability and accuracy. As a result of this project is the initial stage of work, the information can not be full, comparable projects in this area or less accumulated relatively little information, estimate the approach flawed and unscientific, making construction cost management and the cost of work At this stage difficult to accomplish something.

Construction cost management to a passive design drawings prepared in accordance with the budget estimate and project cost calculated mainly ignored in the design stage to optimize the design of construction cost management, effective cost control. According to relevant statistics show that the impact

1

of the design phase of investment for the possibility of more than 75 percent, but China's designers, most of the pursuit of high safety and design fees, the design does not consider economic factors, resulting in a number of large projects waste materials Phenomenon.

Construction Cost Management divorced from each other at all stages, investment estimates, budget for the design and construction budget plans, the contract price, prices, accounts for price, the cost of these six stages from construction units and departments in charge of the design units, the respective management of construction enterprises, The former do not have control of the latter, which affected the former project cost effective management system.

China's current construction cost management information system to collect finishing imperfections. The project has been completed the construction cost of collection, collation and analysis of information on the cost of the division is of great reference value. At present, China's very limited information on this part, most of all a personal cost engineer, can not share data. Cost can not be division between the exchanges and learn from each other, causing a big waste of resources.

The following projects from the various stages of construction of a concrete analysis of how to strengthen the whole process of project cost management:

(1)The decision-making phase of the project cost management is the beginning. In the investment decision-making phase of the project, the project's economic decision-making and various kinds of technology, investment and the project after the completion of the project have a decisive impact on economic efficiency, control of the project investment is a very important stage. Specifically, the decision-making phase of the project, a project in the new project proposals approved, the project cost advisory body should be based on long-term national economic development planning, economic development in

2

various sectors in economic development planning the basic requirements of the proposed project to Technically advanced and economically reasonable, and favourable in the community can create benefits, financial and other aspects of the implementation of a comprehensive and full investigation, analysis and feasibility studies, do a good job in the feasibility study. For policy makers decided to provide a reliable basis for the project. Investment decision-making phase of the construction cost of the entire process of project cost if Lan has a decisive impact on the overall situation. The construction project feasibility studies and investment decision-making is a source of the project cost. Cost is determined reasonable assessment of construction projects, the key follow-up work.

(2)Phase of the project design phase of the design expenses only construction costs of the entire life of less than 1%, but the impact of the project cost accounts for more than 75 percent, and often easy to be ignored. Therefore, the project cost advisory body should be the design phase of cost management as a whole process of cost management in the key task. Preliminary design of the project budget for the accuracy of a certain country or industry and meet the depth requirements, effective control of project cost is the premise. Seize this critical design of the project cost control can be achieved multiplier effect. The design phase of cost control, is the source of cost control, is the most fundamental and important control.

(3)Bidding phase of the project cost management is an important component of an acceptable kind of works commissioned by the owners of the list (or engineering Base Price) and a series of relevant documents, basic price of the pipeline is bidding management of the core work, because the basic price is Determine the price of the contract basis, with only the basic price of science, can we correctly judge the tender reported by the reasonable prices and reliability can be when the make the right decisions, strictly implement the project bidding regulations, grasp Price is reasonable and competitive. Evaluation and calibration of the cost Practitioners and the preparation of

3

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说综合文库工业工程 - 外文翻译在线全文阅读。

工业工程 - 外文翻译.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/zonghe/521030.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: