Fixed fee with a bonus and penalty. With this type of fixed fee, the contractor is reimbursed the actual cost of construction plus a fee. A target cost estimate is set up and, if the cost is less than the target amount, the contractor receives a bonus of a percentage of the savings. If the cost goes over the target figure, there is a penalty.

Changes in contract

It is standard practice that a construction contract gives the owner the right to make changes in the work within the general scope of the contract during the construction period. Depending on the contract and its terms, such changes might involve additions to or deletions from the contract, modifications of the work, and changes in the methods or manner of work performance, changes in owner-provided materials or facilities, or even changes in contract time requirements.

On a unit-price contract, changes are automatically tract, unless changed work involves items that were not included in the original contract, unless the changes are so extensive the contractor and owner is authorized by the contract to request adjustment in the unit prices affected, or unless an extension of time will be required. When a change to a publicly financed project is involved, the contractor may be well advised to determine if the change is with in the scope of the changes clause of the contractor and that public agency has followed the procedural requirements of the applicable statue.

When the owner or its agent orally approved the additional work and promised to pay extra for it, had knowledge that it was being performed without written authorization and did not protest, the courts have ruled either that the work was done under an oral contract separate and distinct from the written one or that the clause requiring written authorization was waived. The courts have sometimes disregarded the requirements for a written order on the grounds that it is unjust enrichment for the owner to enjoy the benefit without having to pay for it.

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说教育文库工程管理英语论文(10)在线全文阅读。

工程管理英语论文(10).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/jiaoyu/1190743.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: