3.2.8 Press Ring

? The press ring supports the glass during the pressing operation.

? The press operation presses the glass to achieve the proper perimeter shape.

? The press ring resides below the bender conveyor until the glass reaches a position directly above the ring. At this point the ring elevates, lifting the glass above the conveyor towards the mold. The mold is in turn lowering from its home position to contact the press ring. 3.2.9 Quench Ring Shuttle

? The quench ring shuttle holds and transports the quench rings from the bender through the quench then onto the cooler.

? There are three quench rings present on the quench ring shuttle.

3.2.10 Quench

? The quench uses a high-pressure sweep quench for the tempering process through the application of air to the upper and lower surfaces of the glass.

? The quench has a clamshell feature that allows the blast heads to open and close around the quench ring. This allows for easy access for cleaning, maintenance and setup.

? The quench blastheads are configurable to match the curvature of the bent part through the use of a template. The template is part specific and is inserted at the beginning of a new part run.

3.2.11 Glass Catcher Bars ? The glass catcher bars are located over the Quench Ring shuttle at the blow up area and hold the glass until it falls onto the cooler conveyor.

3.2.12 Cooler ? The cooler is used to reduce the temperature of the glass to safe handling temperatures. The cooler is normally divided between Kevlar

covered rolls and rubber coated rolls. The cooler also transports the glass to the unload area.

3.2.13 Unload ? The unload area is located at the end of the cooler conveyor. It has rubber-covered conveyor rolls designed to prevent the glass from being scratched during unloading.

3.2.14 Off-Line Press Stations ? The off-line press stations are used to setup and test the bender module before is it inserted into the system. The stations contain all of the necessary equipment to functionally test the bender module during a part change over. The stations also allow for the pre-heating of the mold to cut-down on the change over time.

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说综合文库科技翻译练习(5)在线全文阅读。

科技翻译练习(5).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/zonghe/547306.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: