77范文网 - 专业文章范例文档资料分享平台

科技翻译练习(2)

来源:网络收集 时间:2019-03-27 下载这篇文档 手机版
说明:文章内容仅供预览,部分内容可能不全,需要完整文档或者需要复制内容,请下载word后使用。下载word有问题请添加微信号:或QQ: 处理(尽可能给您提供完整文档),感谢您的支持与谅解。点击这里给我发消息

...................................................... 35 7. EXTERNAL PRESS BENDER (EPB) OPERATIONAL

CONCEPTS ................................................. 37 7.1 HEAT

TRANSFER: ............................................................................................................................ 37 7.2 TEMPERATURE DIFFERENTIAL (TOP TO BOTTOM):............................................................................. 38 7.3 HEAT

PROFILES: ............................................................................................................................. 38 7.4 HEAT

TIME:..................................................................................................................................... 38 7.5 QUENCHING THE

GLASS: ................................................................................................................. 39

8. EXTERNAL PRESS BENDER (EPB) OPERATOR

CONTROLS ...................................................... 40 8.1

OVERVIEW: ..................................................................................................................................... 40

8.2 LOAD TABLE

STATION: .................................................................................................................... 41

8.3 THE HUMAN MACHINE INTERFACE (HIM) WORKSTATION: .................................................................. 42 8.4 VACUUM

STATION: .......................................................................................................................... 42 8.5 PRESS/QUENCH STATION

(PEDESTAL): ............................................................................................ 43

8.6 PRESS STATION PUSH-BUTTON

STATION: ........................................................................................ 47

8.7 PRESS STATION REMOTE DRIVE

PANEL: .......................................................................................... 48 8.8 PLC CONTROL

PANEL: .................................................................................................................... 51

9. EXTERNAL PRESS BENDER (EPB) OPERATOR

INSPECTIONS .................................................. 52 9.1 INSPECTIONS TO BE

DONE: .............................................................................................................. 52 9.2 PNEUMATIC PRESSURES

LISTING: .................................................................................................... 54

10. EXTERNAL PRESS BENDER (EPB) PROCESS DESCRIPTION (WITHOUT FAN ROLLS) ....... 55 10.1 INTRODUCTION:............................................................................................................................... 55 10.2 THE PROCESS DESCRIPTION: .......................................................................................................... 55 10.3 EQUIPMENT SECTIONS BREAK-DOWN: ............................................................................................. 56 10.4 MODES OF OPERATION: .................................................................................................................. 57 10.5 THE PROCESS OVERVIEW BY SECTIONS: ......................................................................................... 58 10.6 SYSTEM SUMMARY: ........................................................................................................................ 61 11. EXTERNAL PRESS BENDER (EPB) PRODUCTION SETUP ....................................................... 65 11.1 OVERVIEW: ..................................................................................................................................... 65 11.2 LOAD TABLE LOAD JAWS: ................................................................................................................ 66 11.3 CHECK THE VACUUM SYSTEM SETTINGS: ......................................................................................... 66 11.4 POSITION / SHAPE TEST: ................................................................................................................. 67 11.5 DAMPER AND INLET VANE SETUP: .................................................................................................... 68 11.6 TYPICAL PRODUCTION SETUPS: ....................................................................................................... 70 12. EXTERNAL PRESS BENDER (EPB) TOOLING CHANGEOVER ................................................. 71 12.1 OVERVIEW: ..................................................................................................................................... 71 12.2 REMOVAL OF THE BENDER: ............................................................................................................. 74 12.3 INSERTION OF THE BENDER: ............................................................................................................ 75 12.4 OFF-LINE BENDER TOOLING CHANGEOVER: ..................................................................................... 79 OFF-LINE PRESS CHECKLIST ...................................................................................................................... 87 FURNACE JOB CHANGE CHECKLIST (GLASS TO GOOD GLASS) ...................................................................... 91 BASIC HEATING TIMES/LINE SPEEDS & HEAT PATTERN ................................................................................ 95 BENDER LUBRICATION: ............................................................................................................................... 96 13. CONTROL SYSTEM TERMINOLOGY ............................................................................................ 98 14. GENERAL FURNACE TERMINOLOGY ....................................................................................... 101 15. EXTERNAL PRESS BENDER (EPB) TERMINOLOGY ................................................................ 112 APPENDIX - EXTERNAL PRESS BENDER (EPB) OPERATOR INSPECTIONS PM SHEETS ............ 115 PREVENTIVE MAINTENANCE SHEETS ......................................................................................................... 115 APPENDIX – GENERAL OPERATOR INSPECTIONS PM SHEETS ..................................................... 118 OPERATOR INSPECTIONS TO BE DONE HOURLY ......................................................................................... 118 OPERATOR INSPECTIONS TO BE DONE EACH SHIFT ................................................................................... 119 OPERATOR INSPECTIONS TO BE DONE DAILY ............................................................................................ 120 OPERATOR INSPECTIONS TO BE DONE WEEKLY ......................................................................................... 121 OPERATOR INSPECTIONS TO BE DONE MONTHLY....................................................................................... 125 INDEX: ...................................................................................................................................................... 126

1. Introduction 简介

1.1 Purpose目标:

1.1.1 This manual is intended to aid the machine operators and should be kept in the control room or near the primary operator interface.

1.1.1 本手册旨在帮助机器操作人员

1.1.2 The information in this manual describes normal activities for setting up and operating the system. It includes safety information that MUST be followed when performing those tasks. Failure to follow the safety information can result in serious injury.

1.1.3 This manual MUST be read and thoroughly understood by all personnel who will be operating the system. If an operator is unable to read this manual, it MUST be thoroughly communicated to that individual before they attempt to operate the system.

1.2 Personnel:

1.2.1 The personnel operating this equipment MUST have basic minimum skills. It is not necessary that all

employees have each skill, but operators must be knowledgeable in each of the areas listed below. With a good knowledge base, maximum system productivity can be achieved.

1.2.2 NOTE: In order to realize maximum system productivity, Glasstech recommends that supervisors be familiar with all areas listed below and / or have previous experience in the glass industry. 1.2.3 The operators should understand and be able to: ? Make minor mechanical setup adjustments ? Understand glass tempering theory ? Inspect glass for defects

? Develop and setup heat profiles for various thicknesses of glass ? Work with computers ? Read process flow charts

? Have a working knowledge of mechanical systems and how different systems work together.

NOTE: Glasstech will provide training on these topics during installation, but previous experience is very beneficial.

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说综合文库科技翻译练习(2)在线全文阅读。

科技翻译练习(2).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/zonghe/547306.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: