14. All barracks vehicles and electrical equipment, oil tanks should be grounded, and the grounding resistance is less than 10 Ω.

15、不准在营房或帐蓬内私自接电线、安装照明装置,排除电气故障应由电工操作。

15. No private wiring in barracks or tents, lighting installation, electrical troubleshooting should be operated by the electrician.

16、 架空电缆应有低压保护装置,穿越车道的架设高度应大于5.8m,其他架设高度应大于3.5m。

16. The overhead cable shall have a low voltage protective device, the erection height of the driveway shall be greater than 5.8 m, and the other erection height shall be more than 3.5 m.

17、地下电缆埋设深度应大于0.3m,埋设沿线应设标记。

17. The buried depth of underground cable should be greater than 0.3 m, and the mark should be set up along the buried line.

18、 移动电缆应采用铠装式电缆,穿越车道应有防车辆碾压设施。 18. Mobile cables should be armored cables, and vehicular roller compaction facilities should be used across the driveway. 5.2职业病预防

5.2 Prevention of occupational diseases

在施工现场设置各种设施,预防职业病的发生,确保人员身体健康,具体做法如下:

The installation of various facilities at the construction site to prevent the occurrence of occupational diseases and to ensure the health of the personnel are as follows:

1、 冬季进行野外管线施工,在施工现场作业人员注意保暖,预防流感等传染性疾病。

1. The field pipeline construction in winter, the construction site workers pay attention to keep warm, prevent influenza and other infectious diseases.

26

2、保证施工现场有充足的饮用水。

2. Ensure that there is plenty of drinking water at the construction site.

3、 合理安排施工进度,保证施工人员有充足的休息时间。

3. Make reasonable arrangements for construction progress and ensure adequate rest time for construction workers. 5.3饮食健康管理

5.3 Diet Health Management

1、 食堂内设置蒸煮消毒、灭蚊蝇等卫生设施。

1. The canteen is equipped with cooking and disinfection, mosquito and fly control and other sanitary facilities.

2、食品采购,必须保证食品新鲜、卫生和处于保质期内。

2. Food procurement, must ensure that the food fresh, hygienic and within the shelf life.

3、 餐后剩余食品应妥善保存,尽量存放在冰柜内,存放时间较长或隔夜变质食品严禁再次食用。

3. Food surplus after meal should be properly preserved and stored in freezer as far as possible. It is forbidden to eat food again for longer storage time or overnight deterioration. 5.4传染性疾病处理

5.4 treatment of infectious diseases

1、 项目部购置各种常备药品和简易医疗器具,以应付各种突发事件的发生。 1. The project department buys all kinds of medicines and medical instruments to deal with emergency.

2、项目部与就近医疗机构建立联系,施工人员出现较重病情时,立即送往医院进行救治。

2. The project department established contact with the nearest medical institution.

3、 对所有疾病和事故应进行调查,分析原因以便从中吸取教训,做出正确

27

的预防工作。

3. We should investigate all diseases and accidents, analyze the causes so as to draw lessons from them and make correct prevention work.

4、疾病及事故发生时,应向HSE管理部门递交调查报告。重大疾病和事故发生时,管理人员应在24小时内向领导小组提交调查报告,以便及时正确地开展善后处理工作。

4. The investigation report should be submitted to the HSE management when the disease or accident occurs. In the event of major illness and accident, the management shall submit the investigation report to the leading group within 24 hours so that timely and correct treatment can be carried out.

六、施工现场HSH保证措施

VI. HSH guarantee measures on construction site

6.1 组织管理

6.1 organizational management

1、 项目经理每月组织HSE管理领导小组成员进行1次安全检查。施工机组由班组长组织HSE管理员、生产骨干进行每周1次班组检查。每次检查要有记录,对查出的问题和隐患应及时整改。

1. The project manager organizes the HSE management leading group member to carry on the safety inspection once a month. Construction unit by the team leader to organize the HSE administrator, production backbone once a week team inspection. Every inspection should be recorded, and the problems and hidden dangers should be corrected in time.

2、各单位工程开工前,应将施工安全技术要求用正规醒目字样写在牌上,并放在进入工地的出入口处。

2. Before the project starts, the construction safety technical requirements shall be written on the plate with the formal bold words and

28

placed at the entrance and exit of the construction site.

3、全体施工人员应学习公司及业主的安全管理规章制度,服从 业主安全部门的管理。

3. All constructors shall learn the safety management rules and regulations of the company and the owner, and obey the management of the owner security department.

4、施工现场临时设施及水、电、气设置应首先取得业主许可,并符合安全要求。

4. Construction site temporary facilities and water, electricity, gas installation should first obtain the owner's permission, and comply with safety requirements.

6.2 施工作业HSE现场保证措施图示

6.2 drawings of HSE site assurance measures for construction operations

1、 施工进出场位置设置九牌三图

1. The position of the construction entrance and exit yard is set up with nine cards and three diagrams

29

2、对本项目进行环境因素及重大危险源进行辨识公示

2. To identify and publicize the environmental factors and major hazard sources of the project

3、施工现场设置吸烟室和饮水室

3. Smoking rooms and drinking water rooms at the construction site

30

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说综合文库HSE-中英-施工方案(6)在线全文阅读。

HSE-中英-施工方案(6).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/zonghe/298527.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: