设,2007.1: 49-50.(WU Xiaofeng, SONG Zhaoshang, LI Tingchun. Discussion on Mechanism of Development of Cracks Resulted from Pre-splitting Blasting and Design Method for Determining Space of Blasting Holes[J],China Harbour Engineering.)
[6] 贾惠艳,高红江,罗涛.桐柏抽水蓄能电站地下厂房岩锚梁岩台开挖工艺[J].辽宁工程技术大学学报,
2005.4:549-551.( JIA Huiyan1, GAO Hongjiang, LUO Tao.Technical on rock step excavation of rockwall crane beam of Tongbai pumped-storage hydroelectric project[J], Journal of Liaoning Technical University.)
[7] 赵志刚,谭云亮,王斐峰. 钢纤维混凝土试验研究与疲劳破坏模拟[J]. 筑路机械与施工机械化,2007.2:40-42.(ZHAO Zhigang, TAN Yunliang, WANG Feifeng, Experimental Study and Fatigue Failure Simulation on Steel Fiber Concrete[J], Road Machinery & Construction Mechanization.) [8] 韩嵘,赵顺波,曲福来. 钢纤维混凝土抗拉性能试验研究[J]. 土木工程学报,2006.11:63-65.(Han Rong, Zhao Shunbo, Qu Fulai. Experimental study on the tensile performance of steel flber reinforced concrete, China Clvil Engineering Journal.)
Study on key technical of excavation and support of underground
powerhouse in hydroelectric station
JIA Hui-yan1, GAO Hong-jiang2, PEN Xiao-an3
1.College of Resources and Environment Engineering, Liaoning Technical University, Fuxin (123000)
2.College of Civil Architecture Engineering, Liaoning Technical University, Fuxin (123000)
3.Water Conservancy Bureau In Jiashan county,Zhejiang province,(314100)
Abstract
Based on domestic much sames’ projects experience and Engineering geologic conditions of underground powerhouse, excavating layering measure and presplit blasting of powerhouse upper part was established, and the optimum methods of rock excavation, the most available layout of bore hole, the most effective formation of explosive charge and other relative blasting parameter were ultimately determined by repeatedly analog excavation test. This paper studied the mechanical properties and working properties of steel fiber concrete, determined the mixture of steel fiber reinforced concrete related to requirement of support and construction by field and laboratory test. The critical construction technology of wet steel fibers shotcrete is briefly presented
Key words:excavation scheme,layout of bore hole,mixture of steel fiber reinforced concrete,the wet spraying concrete technology
作者简介:贾惠艳(1975.9-),女,辽宁北宁人,博士生,讲师,主要从事岩土工程和工程地质等领域的教学与科研工作。