Below the cost, in order to change the state of losses, a construction enterprise is often use time limit for stress condition, forcing the owner to accept its change design scheme, replacement of materials required refiners, even and owner hook connect, will see conditions and other projects QianZhengLiang increase several times, cause loss of state-owned assets; 2 it is construction unit and a few design units collude in collusion, in construction process manufacturing a lot of the change of the design, the construction unit of high prices claim for convenience.
2.4 completed project cost audit settlement stage management confusion
According to the relevant laws and regulations, engineering audit charge is according to the settlement and subtract the forehead charges, consulting unit to high fees, often WanHuaYang reduce quantity, and even apply mechanically norm, multiplied by less than 1 unit price coefficient. And the contractor on the buy off the cost intermediary organizations personnel, quantity and subtract the forehead of the false report.
3 whole process cost control management advice
3.1 design units should be held responsible for their own reasons of the value of the project provided
In view of the current social intermediary cost consultation institutions participated in the design stage cost control of the few features, set up bear related civil liability constraint mechanism, make design institute has a relatively independent responsibility restraint. Such
as design depth is not enough, the design drawing contradictory between different work, the conflicts between; The design of the function and will be setting is unreasonable, affecting the normal use, which caused economic losses, design units shall bear the corresponding civil liabilities.
3.2 The bid assessment methods, and the bid evaluation committee and budget control price review
The government investment projects, the comprehensive assessment shall be allowed to bid evaluation method, and should also set the lower bid price quotations, a bidder below lowest limit of the offer, shall be null standard treatment. The price for budget control review to scientific and reasonable can't raise or floating, to control the price discount published, the competent construction administrative departments should give correct. At the same time for budget control in the price of illegal or irregular and infringe upon the lawful rights and interests of the parties bidding behavior to deal with according to law.
According to the contract period, 3.3 contract signed contract amount is fixed cost
The contract is throughout the entire cost control, the soul of the stand or fall of contract signing, directly influence subsequent cost control of performance, because both sides sign the is fixed unit price or a fixed unit price contract, recent construction engineering material market price volatility is frequent, make the developer and the contractor can predict market price risk, leading to the price of work valuation dispute increase, part of the project under construction is already seriously affected the construction progress and quality of the project. In order to safeguard the legitimate interests of the contracting parties, ensure the construction market stability and development, according to the national nine ministries and the standard construction bidding documents \international engineering construction bidding risk sharing practices, the proposal of the
construction engineering construction of valuation price 0-5% risk sharing.
3.4 construction stages invite professional construction cost consultation company site tracking
In order to strengthen the dynamic cost management, the employer may, the cost of hiring a professional consulting company, make full use of their familiar with the business, rich experience and understanding market and specialization and socialization and advantage, strict control engineering change, strengthen economic management visa.
【Summary】:Above all, it is known that the investment control in the construction of the
key is, three key points is feasibility research, design and contract, solve the problem that is the core of control and management. The engineering cost control and management is a dynamic process, in each project construction phase, may be because the market conditions change or other reasons, the engineering investment determination and the engineering cost control tends to be complicated, this needs will project cost management to meet both overall and selectively. To recognize cost and time limit, the quality of the dialectical relationship between, unity, in different stages of the project implementation, cost consultation with staff always to control the engineering cost economic consciousness, careful analysis and make full use of all kinds of information in the construction period, grasp the market pulse, become passive to active, and through the parties positive efforts to work, avoid or reduce the loss of the construction funds, maximize construction funds for the benefit of investment.
【References】:
[1] WeiRuiLi, WangXuePeng. Construction engineering project cost management discussion [J]. J wit, 2011, (19).
[2] JiaoTianLei. Engineering project cost management in the whole process of management
and control [J]. Gansu and science and technology, 2009 (3).
[3] ZhangHongBin. For enterprise engineering project cost management and control discussion [J]. Tianjin metallurgy, 2010, (4).
[4] SuYong, GeWeiPing. Substation project cost management current situation analysis and countermeasures study [J]. Electric engineering in Anhui vocational technical college journal, 2006, (4).
[5] LiuYingMin. Of engineering project cost management [J]. Shanxi building, 2007, (11). [6] MaiHui can. Shallow engineering project cost management and cost control [J]. Sichuan building materials, 2007, (2).
[7] JiangJiXing. Strengthen cost management establish control consciousness [N]. China construction news, 2011-07-04 (008).
翻译:
浅谈工程建设项目的全过程造价控制
【摘要】:本文主要介绍了工程建设项目的造价控制贯穿项目实施的全过程,包括项
目决策、项目设计、项目招标投标、项目施工和竣工结算这五个阶段。
【关键词】:项目, 建设造价, 工程, 项目, 建设,工程造价
工程建设项目的造价控制贯穿项目实施的全过程,包括项目决策、项目设计、项目招标投标、项目施工和竣工结算这五个阶段。据有关统计资料显示,在项目决策阶段及设计阶段,影响建设项目造价的可能性为40%-75%;而在施工阶段,影响建设项目造价的可能性仅为5%-25%。显而易见,控制造价的关键环节是在项目具体实施之前的决策和设计阶段。而从阶段性程序上讲,施工管理则能起到决定性的作用。控制工程造价就是在项目决策阶段、设计阶段、施工阶段、项目招标投标、竣工结算阶段把建设工程造价的发生额都控制在批准的限额以内,并随时纠正发生的偏差,确保分部分项各自投资目标的实现,以获得最佳的经济效益和社会效益。
1 全过程造价控制各阶段基本情况
建设项目的全过程造价控制基本上可划分为如下五个阶段:
1.1 建设项目决策阶段造价控制
项目投资决策是选择和决定投资行动过程,是对拟建项目的必要性和可行性进行技术经济认证,正确决策是合理确定与控制工程造价的前提,包括可行性研究、投资估算、财务基础数据测算与评价。项目投资决策阶段造价控制与管理的重点是: 1)积极做好项目决策前准备工作。全面搜集有资料,包括设备运行情况、设备技术参数、建筑市场动态等相关内容的原始记录及信息。要认真做好科学的调查研究工作,进而寻找出需要着重解决的问题。
2)切实做好项目建议书和可行性研究报告的编制工作。必须根据市场需求及发展前景,合理确定工程的规模及建设标准。立项申请应该具较强的说服力和可行性。在争取早日立项的同时,应尽快完成可行性研究报告的编制。
3)科学地开展建设项目的效益分析活动并编制工作投资估算。投资估算的编制要有依据,要尽可能细致、尽可能合理。要从现实出发,充分考虑到在项目实施过程中可能出现的各种意外情况及不利因素,以及它们对工程造价可能产生的负面影响,要考虑市场