77范文网 - 专业文章范例文档资料分享平台

Cost Accounting - 14E - Chapter 05(8)

来源:网络收集 时间:2019-04-02 下载这篇文档 手机版
说明:文章内容仅供预览,部分内容可能不全,需要完整文档或者需要复制内容,请下载word后使用。下载word有问题请添加微信号:或QQ: 处理(尽可能给您提供完整文档),感谢您的支持与谅解。点击这里给我发消息

Answer the following questions using the information below:

Velshi Printers has contracts to complete weekly supplements required by forty-six customers. For the year 2010, manufacturing overhead cost estimates total $840,000 for an annual production capacity of 12 million pages.

For 2010 Velshi Printers has decided to evaluate the use of additional cost pools. After analyzing

manufacturing overhead costs, it was determined that number of design changes, setups, and inspections are the primary manufacturing overhead cost drivers. The following information was gathered during the analysis:

Cost pool Manufacturing overhead costs Activity level Design changes $ 120,000 300 design changes Setups 640,000 5,000 setups Inspections 80,000 8,000 inspections Total manufacturing overhead costs $840,000

During 2010, two customers, Money Managers and Hospital Systems, are expected to use the following printing services:

Activity Money Managers Hospital Systems Pages 60,000 76,000 Design changes 10 0 Setups 20 10 Inspections 30 38

29) Assuming activity-cost pools are used, what are the activity-cost driver rates for design changes, setups, and inspections cost pools?

A) $400 per change, $128 per setup, $10 per inspection B) $360 per change, $320 per setup, $6.40 per inspection C) $168 per change, $538 per setup, $42 per inspection D) $286 per change, $152 per setup, $20 per inspection Answer: A

Explanation:

A) Design changes: $400 per change = ($120,000 / 300 design changes) Setups: $128 per setup = ($640,000 / 5,000 setups)

Inspections: $10 per inspection = ($80,000 / 8,000 inspections) Diff: 2

Terms: activity-based costing (ABC) Objective: 5

AACSB: Analytical skills

36

Copyright ? 2012 Pearson Education, Inc.

30) Using the three cost pools to allocate overhead costs, what is the total manufacturing overhead cost estimate for Money Managers during 2010? A) $13,700 B) $6,500 C) $6,860 D) $10,192 Answer: C Explanation: C) $6,860 = (10 × $400 per change = $4,000) + (20 × $128 per setup = $2,560) + (30 × $10 per inspection = $300) Diff: 3

Terms: activity-based costing (ABC) Objective: 5

AACSB: Analytical skills

37

Copyright ? 2012 Pearson Education, Inc.

Answer the following questions using the information below:

Whitman Printing has contracts to complete weekly supplements required by forty-six customers. For the year 20X5, manufacturing overhead cost estimates total $840,000 for an annual production capacity of 12 million pages.

For 2010 Whitman Printing decided to evaluate the use of additional cost pools. After analyzing

manufacturing overhead costs, it was determined that number of design changes, setups, and inspections are the primary manufacturing overhead cost drivers. The following information was gathered during the analysis:

Cost pool Manufacturing overhead costs Activity level Design changes $ 120,000 200 design changes Setups 640,000 4,000 setups Inspections 80,000 16,000 inspections Total manufacturing overhead costs $840,000

During 2010, two customers, Money Managers and Hospital Systems, are expected to use the following printing services:

Activity Money Managers Hospital Systems Pages 60,000 76,000 Design changes 10 2 Setups 20 10 Inspections 30 38

31) Assuming activity-cost pools are used, what are the activity-cost driver rates for design changes, setups, and inspections cost pools?

A) $600 per change, $160 per setup, $5.00 per inspection B) $500 per change, $400 per setup, $7.50 per inspection C) $420 per change, $210 per setup, $52.50 per inspection D) $666 per change, $250 per setup, $8.00 per inspection Answer: A Explanation:

A) Design changes: $600 per change = ($120,000 / 200 design changes) Setups: $160 per setup = ($640,000 / 4,000 setups)

Inspections $5.00 per inspection = ($80,000 / 16,000 inspections) Diff: 2

Terms: activity-based costing (ABC) Objective: 5

AACSB: Analytical skills

38

Copyright ? 2012 Pearson Education, Inc.

32) Using the activity-cost driver rates determined in the previous question, what is the manufacturing overhead cost estimate for Hospital Systems during 2010? A) $6,227.50 B) $2,990.00 C) $4,136.00 D) $6,825.00 Answer: B

Explanation: B) $2,990 = (2 × $600 per change) + (10 × $160 per setup) + (38 × $5.00 per inspection) Diff: 3

Terms: activity-based costing (ABC) Objective: 5

AACSB: Analytical skills

33) Availability of reliable data and measures should be considered when choosing a cost-allocation base. Answer: TRUE Diff: 1

Terms: activity-based costing (ABC) Objective: 5

AACSB: Reflective thinking

34) When designing a costing system, it is easiest to calculate per-unit costs first, and then total costs. Answer: FALSE

Explanation: When designing a costing system, it is easiest to calculate total costs first, and then per-unit costs. Diff: 1

Terms: activity-based costing (ABC) Objective: 5

AACSB: Reflective thinking

35) ABC systems attempt to trace more costs as indirect costs. Answer: FALSE

Explanation: ABC systems attempt to trace more costs as direct costs. Diff: 1

Terms: activity-based costing (ABC) Objective: 5

AACSB: Reflective thinking

36) ABC systems create heterogeneous cost pools linked to different activities. Answer: FALSE

Explanation: ABC systems create homogeneous cost pools linked to different activities. Diff: 1

Terms: activity Objective: 5

AACSB: Reflective thinking

39

Copyright ? 2012 Pearson Education, Inc.

37) ABC systems seek a cost allocation base that has a cause-and-effect relationship with costs in the cost pool.

Answer: TRUE Diff: 1

Terms: activity-based costing (ABC) Objective: 5

AACSB: Reflective thinking

38) For service organizations, activity-based cost systems may be used to clarify appropriate cost assignments. Answer: TRUE Diff: 1

Terms: activity-based costing (ABC) Objective: 5

AACSB: Use of Information Technology

39) For each of the following activities identify an appropriate activity-cost driver.

a. machine maintenance b. machine setup c. quality control d. material ordering

e. production scheduling f. warehouse expense g. engineering design

Answer: Any one of the listed cost drivers is correct. Activity # of machines Machine hours Actual times for various A. Machine maintenances of various machines Maintenance # of setups Setup hours Actual times for various setups for B. Machine various machines Setup # of inspections Inspection hours Actual times for various C. Quality inspections for various controls Control # of orders Ordering hours Actual times for various orders for D. Material various materials Ordering Scheduling Actual times for various runs for E. Production # of runs hours various schedules Scheduling F. Warehousing # of bins, aisles Picking hours Actual times for various parts for various warehousing activities Actual times for various G. Engineering # of engineers Engineering # of designs hours engineering designs Design Diff: 2

Terms: activity Objective: 3, 5

AACSB: Analytical skills

40

Copyright ? 2012 Pearson Education, Inc.

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说综合文库Cost Accounting - 14E - Chapter 05(8)在线全文阅读。

Cost Accounting - 14E - Chapter 05(8).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/zonghe/570445.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: