Total Carried to Summary at the End of Elements -

4/8/1

A

50mm diameter x 3mm thick mild steel hollow section handrail set on rake secretly welded to top of balusters Mild steel balustrade as described to Architect's details: Staircase

EXTERNAL FINISHINGS

ELEMENT NO. 9

BILL NO. 4

(measured separately)

M

12

-

B

Ditto horizontal ditto

M

1

-

C

Extra over for closed rounded end

No

4

-

D E

25mm diameter x 3mm thick mild steel hollow section raked middle rail and bottom rail welded to baluster Ditto for mitres

No

4

-

(measured separately)

M

24

-

F G 40mm diameter x 3mm mild stainless steel balusters 900mm high welded to top handrail, middle rail and bottom rails at 900mm centers; bottom end anchored in concrete Ditto horizontal ditto M 1 - treads (15 No.) Prepare and apply one undercoat and two finishing coats of gloss oil paint in accordance with manufacturer's instructions to: M 14 - H Mild steel surfaces (balustrade both sides) M2 22 - Total Carried to Summary at the End of Elements 4/9/1

PROPOSED CONSTRUCTION OF UGANDA

- REVENUE AUTHORITY HEADQUARTERS

BUILDINGS AT NAKAWA

PARKING TOWER BILL NO. 4 LEVEL 5 SUMMARY OF ELEMENTS

Element No. 2: Superstructure

Element No. 8: Internal Finishings

Element No. 9: External Finishings

-

-

-

Total Carried to General Summary -

S

Item A Excavate oversite average 150mm deep to remove top Site Clearance, Excavations and Earthworks SUBSTRUCTURE (ALL PROVISIONAL) ELEMENT NO. 1 BILL NO. 4 PARKING TOWER PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS BUILDINGS AT NAKAWA Description Unit Quantity Rate, UGX. Amount USHS

vegetable soil and remove from site

M2

2,343

-

B

Excavate to reduce levels

M3

4,686

-

C Ditto not exceeding 1.5M deep from reduced level

D Ditto 1.5M - 3.0M deep ditto

E

Excavate pit for Column base not exceeding 1.5M deep starting from the basement floor level

F

Ditto pit for Column base exceeding 1.5M but not exceeding 3.0m deep ditto

G

Ditto pit for Column base exceeding 3.0M but not exceeding 4.5m deep ditto

H

Ditto pit for Lift Shaft not exceeding 1.5M deep starting from the basement floor level

I

Excavate pit for retaining wall base not exceeding 1.5M deep starting from the basement floor level

J

Ditto pit for retaining wall base exceeding 1.5M but not exceeding 3.0m deep ditto

K

Ditto pit for retaining wall base exceeding 3.0M but not exceeding 4.5m deep ditto

L Extra over lift pit excavation for forming embarkments

M

Extra over excavation for breaking up rock

M3 3,514

M3 3,514

M3 555

M3 555

M3 370

M3 12

M3 549

M3 549

M3 366

M3 80

M3

10

- - - - - - - - - -

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说综合文库建筑类常见词汇,句子翻译(8)在线全文阅读。

建筑类常见词汇,句子翻译(8).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/zonghe/543201.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: