Prepare and apply three coats of polyurethane clear vanish in accordance with manufacturer's instructions to:

E General surfaces of wood

F Wood surfaces not exceeding 100mm girth

G Wood surfaces 200 - 300mm girth

To collection

Page No. 4/8/1

Page No. 4/8/2

M2 102

M 259

M 151

C Total Carried to Summary at the End of Elements 4/8/2

BILL NO. 4

ELEMENT NO. 9

EXTERNAL FINISHINGS

Cement and sand (1:4) backing including approved waterproofing additive finished smooth with a steel trowel:

A

50mm thick average laid to falls to receive bitumen roofing

M2

2,623

APP - Modified Bitumen

4mm thick EPDM APP modified bituminous water proofing membrane reinforced with polyester with 50mm side and 75mm end laps, fully bonded and torch applied onto solvent base primer conforming to ASTMD- 41 applied in accordance with manufacturers instructions; to

B

Flat roof terrace

M2

2,623

Concrete Pavers

Provide and lay 600mm x 600mm x 60mm thick approved precast concrete paving slabs; bedded on 50mm sand blinding including jointing with approved

water proof cement and sand mortar (1:4) in straight continuous joints not exceeding 2mm thick in both directions on bitumen (Measured Separately); flush pointed in water proofed grout as described on: C Flat roof terrace Parking Lines M2 1,930 D E 25mm wide yellow parking lines painted with road paint Rainwater Installation 160mm diameter uPVC PN 6 heavy duty drainage down pipe; M 402 plugged to wall/concrete with and including holderbats Extra over for 160mm water shoe. M 120 F 160mm diameter fulbora cast iron outlet. G 450 x 450mm stainless steel grating. H No 10 No 10 No 10 Total Carried to Summary at the End of Elements 4/9/1

PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS

BUILDINGS AT NAKAWA

PARKING TOWER BILL NO. 4 LEVEL 6 SUMMARY OF ELEMENTS

Element No. 2: Superstructure

Element No. 4: External Walls

Element No. 5: Interrnal Walls

Element No. 6: Windows

Element No. 7: Doors

Element No. 8: Internal Finishings

Element No. 9: External Finishings

Total Carried to General Summary S

Item R.C SUPERSTRUCTURE ELEMENT NO. 2 BILL NO. 4 PARKING TOWER PROPOSED CONSTRUCTION OF UGANDA REVENUE AUTHORITY HEADQUARTERS BUILDINGS AT NAKAWA Description Unit Quantity Rate, UGX. Amount USHS

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说综合文库建筑类常见词汇,句子翻译(6)在线全文阅读。

建筑类常见词汇,句子翻译(6).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/zonghe/543201.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: