哈西万达广场 高支模专项施工方案
目 录
一、编制依据................................................................................................................ 3
1.1关于高支模体系需要论证的依据................................................................... 3 1.2国家及地方规范............................................................................................... 3 1.3其他文件........................................................................................................... 3 二、工程概况................................................................................................................ 3
2.1参建单位概况................................................................................................... 3 2.2工程概况........................................................................................................... 4 2.3需论证部位概况............................................................................................... 4 三、工程部署................................................................................................................ 5
3.1方案选择........................................................................................................... 5 3.2材料选择........................................................................................................... 6 3.3机械准备........................................................................................................... 8 3.4作业条件........................................................................................................... 8 四、支撑体系施工工艺................................................................................................ 8
4.1总体工艺流程................................................................................................... 8 4.2梁模板支撑....................................................................................................... 9 4.3板模板支撑..................................................................................................... 10 4.3构造要求......................................................................................................... 10 4.5验收要求......................................................................................................... 11 五、模板及钢筋施工工艺.......................................................................................... 12 六、施工监测.............................................................................................................. 12
6.1一般监测......................................................................................................... 13 6.2重点监测......................................................................................................... 13 七、混凝土浇筑及支撑体系拆除.............................................................................. 14
7.1高支模混凝土浇筑注意事项......................................................................... 14 7.2混凝土浇筑部署............................................................................................. 15
中国建筑第二工程局有限公司 1 / 84
China state construction engineering corporation
哈西万达广场 高支模专项施工方案
7.3支撑体系拆除................................................................................................. 15 八、安全文明施工管理.............................................................................................. 16
8.1安全保证体系................................................................................................. 16 8.2安全管理流程................................................................................................. 16 8.3安全管理措施................................................................................................. 17 九、高支模应急预案.................................................................................................. 18
9.1应急小组及责任分工..................................................................................... 18 9.2应急响应......................................................................................................... 19 9.3应急救援......................................................................................................... 20 十、计算书.................................................................................................................. 21
10.1主要材料参数表........................................................................................... 21 10.2截面500×2000梁计算 ................................................................................ 21 10.3截面400×2000梁计算 ................................................................................ 27 10.4截面400×1800梁计算(1000mm立柱间距) ......................................... 34 10.5截面500×1200梁计算 ................................................................................ 39 10.6截面400×1200梁计算 ................................................................................ 45 10.7截面300×900梁计算 .................................................................................. 52 10.8截面250×600梁计算(无附加杆) .......................................................... 57 10.9截面300×950梁计算(边框梁) .............................................................. 64 10.10楼板支撑体系计算..................................................................................... 70 10.11楼板荷载验算 ............................................................................................. 76
中国建筑第二工程局有限公司 2 / 84
China state construction engineering corporation
哈西万达广场 高支模专项施工方案
一、编制依据
1.1关于高支模体系需要论证的依据
对于危险性较大工程,根据中华人民共和国建设部《危险性较大工程安全专项施工方案编制及专家论证审查办法》(建质[2009]87号)规定。
模板工程及支撑体系:混凝土模板支撑工程,包括搭设高度8m及以上,搭设跨度18m及以上,施工总荷载15kN/㎡,集中线荷载20kN/㎡及以上。 1.2国家及地方规范 序号 1 2 3 4 5 6 7 8 9 10 11 12 地方 国家 规 范 及 规 程 名 称 《建筑工程施工质量验收统一标准》 《建筑结构荷载规范》(2006年版) 《钢结构设计规范》 《建筑施工安全检查标准》 《建筑施工扣件式钢管脚手架安全技术规范》 《建筑施工模板安全技术规范》 《黑龙江省建设工程资料管理标准》 《建设工程质量管理条例》 《建设工程施工现场管理规定》 《建设工程安全生产管理条例》 《哈尔滨市建设工程质量监督管理办法》 《黑龙江省建筑工程重大危险源安全监控管理暂行办法》 编 号 GB50300-2001 GB50009-2001 GB50017-2003 JGJ59-99 JGJ130-2011 JGJ162-2008 DB23/1019-2006 国务院令第279号 建设部令15号 国务院令第393号 市政府第91号令 黑建安【2006】25号 1.3其他文件
哈西万达广场总承包合同、哈西万达广场施工组织设计、哈西万达广场施工图纸、哈西万达广场模板施工方案。
二、工程概况
2.1参建单位概况
工程名称:哈西万达广场
建设单位:哈尔滨哈西万达广场有限公司
中国建筑第二工程局有限公司 3 / 84
China state construction engineering corporation
哈西万达广场 高支模专项施工方案
设计单位:哈尔滨工业大学建筑设计研究院 勘察单位:哈尔滨市勘察测绘研究院
监理单位:黑龙江正信建设工程监理有限公司 施工单位:中国建筑第二工程局有限公司 2.2工程概况
哈尔滨哈西万达广场位于哈西大街以西,中兴大道以南,南临南兴街,西临西宁南路,总规划用地面积18.74万平方米,规划总建筑面积约86.35万平方米,其中地上65.35万平米,地下21.00万平米。由购物中心、写字楼、公寓、五星级酒店、商务酒店、住宅及底商、配套共建组成。
业态 五星级酒店 写字楼 Soho公寓(2栋) 大商业(计3个单体)
住宅(10栋)
廉租房 幼儿园
2.3需论证部位概况
1、A区酒店二层32-36轴/V-d轴区域梁板,楼层高度13.2m(该区域首层无梁板),梁最大跨度20m,用做酒店大堂,该区域梁截面主要有40031200、40031400、50031200、3003700、3503950、3003900;
2、A区酒店四层31-35轴/T-d轴区域梁板,楼层高度12.6m(该区域三层无梁板),梁最大跨度31.3m,截面积分别为40031800、40032000、50032000其线荷载大于20KN/m,用做宴会厅,该区域其他梁截面主要有35031000、3503900、3503950、35031000、2503600;
3、B1写字楼二层23-24轴/e-k轴区域梁板,楼层高度9.6m(该区域首层无梁板),用做接待大堂,该区域主要梁截面主要有4003700、3003700、3503750。
中国建筑第二工程局有限公司 4 / 84
China state construction engineering corporation
层数 20F/2B 26/2B 30F/2B 4F/2B 32F/2B 15F/1B 3F/1B
建筑面积 4.10万㎡ 3.88万㎡ 9.71万㎡ 25.5万㎡ 33万㎡ 0.52万㎡ 0.31万㎡
结构形式 框架-核心筒 框架-核心筒 框架-核心筒
框架 剪力墙 剪力墙 框架
建筑高度 91.2m 99.8m 99.8m 22.4m 99.8m 48.5m 12.3m
哈西万达广场 高支模专项施工方案
三、工程部署
3.1方案选择
鉴于高支模区域轴线间距不符合300mm模数的情况,考虑到使梁模板及板模板架体能够很好的形成一个整体,决定采用钢管扣件式脚手架支撑体系,立杆间距以900mm为主,局部调整最大不超过1100mm,步距以1200mm为主,局部调整为1500mm;架体沿四周及梁长度方向设置竖向剪刀撑,从扫地杆开始设置水平剪刀撑,根据架体高度不同共设置3-4道,最上面一道水平剪刀撑下满挂安全网。具体搭设样式详见附图。
梁板模板采用15mm厚清水模板,顶板次龙骨为42372木方,间距150mm,主龙骨为85385木方;梁次龙骨顺梁长方向布置,间距不大于150mm,主龙骨采用φ4833.5钢管。
主要梁截面图
截面 50032000 40032000 40031800 断 面 图
中国建筑第二工程局有限公司 5 / 84